At over three years from commission to completion, it goes without saying that we were excited to see this beautiful and fastidiously constructed building finally completed. Credit must go to David Donaldson and the team at Trade Fusion, as their attention to detail resulted in several of the building’s junctions being even better than originally detailed. Thanks also to photographer Brett Boardman for bringing the project to life in these images.
Uncategorized
RETAIL AND HOSPITALITY ROLL OUT CONTINUES
The roll out of the Event Cinema lobbies has continued at a rapid pace, with the completion this month of the Burwood and Hornsby sites, and with site work commencing on the first of several sites in Queensland. Constructed by MPA Projects and Reds Building respectively, the Burwood and Hornsby sites have been met wide solid public approval since opening. The Myer Centre lobby in Queensland is also scheduled for completion over the coming weeks, so please stop by the website in the coming months to see the results.
“RENOVATION FIX” TALKS WITH COCO REPUBLIC
Thanks to our ongoing relationship with Archicentre (the residential consultancy arm of the Institute of Architects) Managing Director Justin Quinlan will be giving a series of talks over the coming months at the Coco Republic “Renovation Fix” workshops. You can find more information on these talks at http://workshoptuesdays.com.au/renovationfix/index.php.
MULTIPLE ARTICLES, MULTIPLE PUBLICATIONS
Over the coming months The Quinlan Group projects will be featured in multiple publications, including Luxury Home Design, Renovate, Smart Homes, Trends, Home Magazine and Domain. Please keep an eye out, and we’d love to hear back from you with any feedback you may have on the articles.
MORE INTERIOR COLLABORATIONS
The latest in a long line of collaborations with Darryl Gordon, this beachside residence was transformed through a refined palette of lime washed timbers, natural stones and rich veneers. The construction work was completedby Don Hanna from DonRose Building in record time, and is a testament to his skill and professionalism. Our next The Quinlan Group / DGD collaboration goes on site in Point Piper later this year – stay tuned.
FINALLY ON SITE IN BELLEVUE HILL
One longest running current project finally goes to site this week, much to the relief of all concerned. This substantial free standing dwelling in Bellevue Hill features six bedrooms, three and a half bathrooms, two living areas, a partially submerged three car garage, a cantilevered swimming pool and a lift. Work is also scheduled to commence shortly on residential projects in Clovelly, Point Piper, Elanora Heights, Penshurst and Kensington.




















+ 61 2 9150 4054